Abdulla Aripov chaired a video conference on the primary tasks which are aimed at heating homes amid the cold weather conditions.
According to the press secretary of the Prime Minister, Bekzod Hidoyatov, the Ministry of Construction and Housing and Communal Economy, together the regional officials will gradually renovate the facades of these 31,000 houses to a basalt coating in two months and provide hot water using alternative energy sources. it was submitted to the Cabinet of Ministers to introduce the project of the program providing for electricity supply.
At the same time, the Ministry will have to start using the high energy efficient building materials and equipment for new multi-story buildings and social sector facilities.
"Uzsanoatqurilishbank" together with the "Uzsanoqurilishmateriallari" association should prepare a separate program for increasing basalt raw material production projects in two months and create a capacity of at least 5 thousand tons by the end of the year.
"O‘zeltexsanot” association has also decided to prepare a separate program for increasing the production capacity of transformers, cables, solar panels and water heating collectors and submit it to the Cabinet of Ministers within two months.
Comments (0)